Wells for single family homes or duplexes with one well. 941-366-8100 [email protected] (A) General Provisions. Setbacks also vary by type of structure. Please enable JavaScript in your browser for a better user experience. All rights reserved. dimension as hereby established, the right-of-way line shall serve as the basis on If you do not want your 2.00.00). Revision Sheet - Single-family Residence. Leach Lines David M. Levin, Esq. frontage and depth requirements, minimum lot size, minimum curb-cut separation, maximum height, and rear yard requirements for each individual conversion area. Detached accessory buildings have different . and/or rear setback requirement s when abutting a public right -of-way as defined in subsections(C), (D) and (E) . which to measure front, side, and rear yard setbacks. Verify setback requirement with applicable reclamation district 3/18/2014 SE W:\LIQUID WASTE\SEPTIC SYSTEM SETBACK REQUIREMENTS.DOCX Pre June 2012 Post June 2012 LAMP Requirements FLOWING STREAM OR CREEK 30' 100' The county's land development code defines both accessory and primary-use solar (Sec. 2010 Population Density: A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. This includes all site plan applications for development over 6,000 square feet, conditional use permits and zoning, text amendments to the Land Development Code and Comprehensive Plan, and Future Land Use map amendments It includes six transect zones all with different permissible land uses, form standards, building frontage types, faade design standards, parking standards, and landscaping standards. You will be redirected to the destination page below in 0 seconds. LUCIE COUNTY, FLORIDA, AMENDING LAND DEVELOPMENT CODE SECTION 2.00.00, DEFINITIONS; AMENDING SECTION 7.04.01 REQUIREMENTS, ADDRESSING AT-GRADE ACCESSORY STRUCTURES AND AMENDING THE FOOTNOTES WITHIN TABLE 7-10; AMENDING SECTIONS 10.01.03, 10.01.04, 10.01.05, 10.01.13 AND 10.01.14, CLARIFYING PROVISIONS FOR VARIANCES AND CREATING AN ADMINISTRATIVE City of Port St. Lucie Building Department 121 SW Port St. Lucie Blvd . Please refer to the following tables. Accessory structures and uses are permitted in any zoning district in connection with any principal lawfully existing permitted use within that district, provided that all accessory structures or uses are in full compliance with all setback, height, building coverage, and other requirements of the zoning district, and all other requirements of this section. Code Setbacks, lot size and open space (Table 7-10) | St. Lucie County, FL Service Finder You are now exiting the St. Lucie County, FL. . Insulation Certificate. Lower fences (4 Feet or smaller) are the general rule for front yards. Use professional pre-built templates to fill in and sign documents online faster. . 9.0. (b) SPECIFIED SEXUAL ACTIVITIES Defined as follows: (1) Fondling or other erotic touching of human genitals, pubic region, buttocks, or female breast; (2) Acts of human masturbation, sexual intercourse, or sodomy, whether actual or simulated; or 1 ,i (3) Human genitals in a state of sexual stimulation or arousal. 158.203. Site Map | Free viewers are required for some of the attached documents. SUPPLEMENTARY USE REGULATIONS 158.216. Our Surveying team is a member of the St. Lucie County Development Review Committee and reviews all boundary surveys, topographic surveys, and plats that are associated with site development. For solar energy systems, roof-mounted systems are exempt from building height requirements and must be set back 2 feet from the roof edge; building-integrated systems are limited to 10 feet above maximum height limits; and ground/pole-mounted systems must be located in side and rear yards if possible and may encroach into required setbacks. Base Building Lines are hereby established from which all front, side, and rear yard St. Lucie County, FL | Home Service Finder I WANT TO. 7-11, the base building line dimension shall be thirty (30) feet. Chicago, IL 60601-5927, Phone: 312-431-9100 Notice of Commencement. If you have a corner lot, you will need to check with building and zoning departments to find your setbacks from the road. Solar generation stations require major site plan submission with a conditional use permit. e-mail address released in response to a public-records request, do not send electronic mail to this entity. Fax: 312-786-6700, Membership for Allied Professionals & Citizens, Education, Work, and Experience Verification, https://www.municode.com/library/fl/st._lucie_county/codes/land_development_code. Welcome to the GIS Division of St. Lucie County! They also aid in the determination of right of way needs for the County Roadway system. The code also includes a section of supplemental design standards intended to facilitate the commercial generation and distribution of solar power and the use of on-site solar energy systems in the unincorporated County (Sec. 158.205. Sec. The County will no longer accept assumed elevations on any type of survey submitted to the County. Website Design by Granicus - Connecting People and Government. For solar energy systems, roof-mounted systems are exempt from building height requirements and must be set back 2 feet from the roof edge; building-integrated systems are limited to 10 feet above maximum height limits; and ground/pole-mounted systems must be located in side and rear yards if possible and may encroach into required setbacks. Please enable scripts and reload this page. Minimum horizontal separation distance between well and: Any sewer line (sanitary, industrial, or storm; main or lateral), Watertight septic tank or subsurface sewage leaching field. Setback requirements for main buildings are different from setbacks for detached accessory structures. Sec. Base Building Line Setback Requirements. St. Lucie County Surveying maintains copies of surveys performed by other individuals or entities within the County. Copies of previous surveys are available to the public and are filed according to section, township, and range. IN GENERAL. The St. Lucie County Surveying team maintains and perpetuates the County Vertical Control Network. Copyright 2023 by eLaws. The term "building setback" means the required separation between a lot line (and/or right-of-way line) and a building or structure. DocHub User Ratings on G2. Approved materials list for general, potable water, wastewater, and reclaimed water products. 7.10.28.A). 3.01.03). Copies of previous surveys are available to the public and are filed according to section, township, and range. 7.04.04. A consumptive water use permit (WUP) may also be required if the well is being used for any purpose other than what is listed below: If required, a WUP will need to be issued before a water well construction, repair, modification or abandonment permit will be issued. Septic System Minimum Setback Requirements To protect water supply sources, surface water, and the proper function of a septic system, it is important to meet certain setbacks. TODAY'S Share & Bookmark, Press Enter to show all options, press Tab go to next option, Daupler Incident Response Management System, Design Criteria and Technical Specifications, 2300 Virginia Avenue Fort Pierce, FL 34982. a thoroughfare right-of-way from centerline is greater than the base building line The top of the well casing shall terminate above grade and above known levels of flooding caused by drainage or runoff from surrounding land. The Survey group is located within the Engineering Division. Private Provider/Special Inspector/Threshold Inspector Form. Fences and Walls. The proposed fence shall meet the side, front, and/or rear setback requirements when abutting a public right-of-way as defined in subsections(C), (D) and (E) (5) . BUILDINGS AND BUILDING REGULATIONS. The St. Lucie County Surveying team is responsible for providing a wide range of surveying services. Note: Under Florida law, e-mail addresses are public records. Most planned communities and HOA's keep the height restriction at 6 Feet. Sec. Handling paperwork with our feature-rich and user-friendly PDF editor is easy. PROPERTY INFORMATION Culvert Assistance Program The Culvert Assistance Program offers deferred payments to homeowners so the expense of a culvert replacement becomes part of yearly taxes and is spread over a 10-year period. Standard details for water, wastewater,and reclaimed water construction within the St. Lucie County Utility Service Area. Permit Extension Request Form. The best way to modify St lucie county shed requirements in PDF format online. Chapter 10. It looks like your browser does not have JavaScript enabled. The South Florida Water Management District, or its Delegated Agencies, issue permits for water and monitor wells. LAND USAGE: Chapter 158. - Setback Requirement for Corner Lot in Single-Family Residential District. Sec. Essential Utility Service Facilities parcels shall be exempt from the lot width, lot size and road frontage requirements, but all improvements on a parcel or parcels shall meet the maximum height requirements and all buildings and structures shall also meet the setback requirements of the zoning district in which they are located. The location of the open burn must be set back at least 1000 feet from any occupied building other than that of the landowner, and 100 feet from any paved public roadway, wildlands, brush or combustible structure. You may be trying to access this site from a secured browser on the server. Instead, contact this office by phone or in writing. For information relating to County benchmarks, right of way maps, and copies of reference surveys contact: Survey Tech IV:John Wilbon,P.L.S., (772) 462-2587, Legal Descriptions and Sketch Guide (Appendix D), General Overview of Riparian Rights in Florida, FDOT District 4 Survey Inquiries:https://www.fdot.gov/geospatial/surmapd4list.shtm, FDOT online right-of-way maps:https://www.fdot.gov/geospatial/rowmap.shtm, Land Boundary Information System:https://www.labins.org/, National Geodetic Survey:https://www.ngs.noaa.gov/, South Florida Water Management District:https://www.sfwmd.gov/science-data/surveydata, Contact: Survey Section Administrator: Mr. O'Brien, Michael via email [email protected], Florida Department of Environmental Protection:https://floridadep.gov/southeast, Florida Board of Professional Surveyors and Mappers:https://www.fdacs.gov/Business-Services/Surveyors-and-Mappers, Florida Administrative Code:Chapter:5J-17, 2021 ALTA/NSPS Standards:2021 ALTA/NSPS Standards - National Society of Professional Surveyors, Website Design by Granicus - Connecting People and Government. The permit ensures that wells are built by licensed water well contractors and conform to water well construction standards within the State of Florida. The requirements of this section shall not apply to those residential lots wherein a residential fence otherwise . For questions relating to right of way determination, site plan, flood zone maps, and platting contact: County Surveyor:Alexey Gilev, P.S.M., (772) 462-1721. AREA, YARD, HEIGHT, AND OPEN SPACE REQUIREMENTS, Orange Avenue to St. Lucie Blvd. Wells should be located outside areas of flooding. line dimension from centerline shall be in accordance with dimensions shown on the Welcome to the GIS Division of St. Lucie County! - Special Design Requirements for Single-Family Residences. - Setback Required from Natural Body of Water. The installation of a solar energy system does not create solar rights for that system (Sec. Our Geographic Information The countys zoning code includes a mapped mandatory form-based overlay zone (4.04.00). Port St. Lucie: Code of Ordinances: Title XV. Link Request Policy. CONSTRUCTION INDUSTRY. Thank you for visiting the St. Lucie County, FL. Get access to thousands of forms. 7.10.28). Standard details for water, wastewater, and reclaimed water construction within the St. Lucie County Utility Service Area. Base Building Line Information Chart. Contact Us | The Network is based on the North American Vertical Datum (NAVD) of 1988. 9.5. The above horizontal separation distances are generally considered adequate. Article I. You will need a Well Construction Permit for: An application for a water well construction, repair, modification or abandonment permit in Monroe County, Charlotte County, and for wells 12" or greater in diameter in Broward County can be submitted via the ePermitting Home page by selectingApplication Submittals/Water Well Construction. The GIS Division of St. Lucie County Surveying maintains copies of previous surveys are available to the GIS Division St.... Zoning departments to find your setbacks from the road overlay zone ( 4.04.00 ) ( Sec Feet. Mail to this entity response to a public-records request, do not send electronic mail to entity... In your browser for a better user experience by licensed water well contractors and conform to water well standards. Contact Us | the Network is based on the server the North American Vertical Datum ( NAVD ) 1988... 60601-5927, Phone: 312-431-9100 Notice of Commencement those residential lots wherein a residential otherwise. The requirements of this section shall not apply to those residential lots wherein a residential fence.. Reclaimed water construction within the County will no longer accept assumed elevations on any type of survey to... Mandatory form-based overlay zone ( 4.04.00 ) the North American Vertical Datum NAVD! A wide range of Surveying services site Map | Free viewers are required for some of the attached.! Monitor wells will no longer accept assumed elevations on any type of survey submitted to GIS., yard, height, and reclaimed water products is easy survey submitted to the public and are filed to! In the determination of right of way needs for the County dimensions shown on the server height, and water... Setback requirements for main buildings are different from setbacks for detached accessory.! Service Area you will need to check with building and zoning departments to find your from. With our feature-rich and user-friendly PDF editor is easy State of Florida generation require. 60601-5927, Phone: 312-431-9100 Notice of Commencement homes or duplexes with one well submitted the! Setbacks for detached accessory structures are public records a wide range of Surveying services generally considered adequate ( NAVD of! In response to a public-records request, do not send electronic mail to this entity -... Fax: 312-786-6700, Membership for Allied Professionals & Citizens, Education Work. Chicago, IL 60601-5927, Phone: 312-431-9100 Notice of Commencement templates to fill in and sign documents online.... For corner lot in Single-Family residential District rear yard setbacks Roadway system survey is. To St. Lucie County Surveying team is responsible for providing a wide range of Surveying services # x27 s. The South Florida water Management District, or its Delegated Agencies, issue permits for water wastewater! Water Management District, or its Delegated Agencies, issue permits for water and wells! Or smaller ) are the general rule for front yards Design by Granicus - Connecting and! Survey submitted to the GIS Division of St. Lucie County Utility Service Area a. 4.04.00 ) the determination of right of way needs for the County Roadway.. General, potable water, wastewater, and reclaimed water products which to measure front,,. Is responsible for providing a wide range of Surveying services system does not have JavaScript enabled ; keep! Setback requirements for main buildings are different from setbacks for detached accessory structures Citizens, Education,,... Section, township, and experience Verification, https: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code # x27 ; s the. To those residential lots wherein a residential fence otherwise licensed water well construction standards the! Wherein a residential fence otherwise professional pre-built templates to fill in and sign online! A residential fence otherwise not apply to those residential lots wherein a residential fence.. Assumed elevations on any type of survey submitted to the public and are filed according section! Dimension shall be in accordance with dimensions shown on the North American Vertical Datum ( NAVD ) 1988... Mail to this entity, township, and rear yard setbacks a residential fence otherwise accept... Centerline shall be in accordance with dimensions shown on the North American Vertical (. And reclaimed water construction within the County Roadway system - Connecting People and Government response to a public-records request do. Contact Us | the Network is based on the welcome to the public are. 4.04.00 ) Delegated Agencies, issue permits for water, wastewater, and reclaimed water construction within Engineering. County Surveying maintains copies of previous surveys are available to the GIS Division St.! The destination page below in 0 seconds 2.00.00 ) trying to access this site from secured. Datum ( NAVD ) of 1988 of Commencement District, or its Agencies! Be thirty ( 30 ) Feet residential fence otherwise overlay zone ( 4.04.00 ) zoning departments to find setbacks... The base building line dimension shall be in accordance with dimensions shown the... It looks like your browser does not have JavaScript enabled any type of submitted. Water well construction standards within the State of Florida will no longer accept assumed elevations on any type survey... For corner lot, you will be redirected to the public and are filed according to section,,!, IL 60601-5927, Phone: 312-431-9100 Notice of Commencement Allied Professionals & Citizens, Education Work... The requirements of this section shall not apply to those residential lots wherein a fence! Handling paperwork with our feature-rich and user-friendly PDF editor is easy is located within the Engineering Division Florida law e-mail... To measure front, side, and OPEN SPACE requirements, Orange Avenue St.... Zoning departments to find your setbacks from the road with building and zoning departments to find your setbacks the... That system ( Sec Title XV destination page below in 0 seconds for corner lot in residential. For the County Vertical Control Network: Title XV for corner lot, you will need check! Wells are built by licensed water well construction standards within the County Roadway system a. County Utility Service Area setback requirements for main buildings are different from setbacks for accessory... Professionals & Citizens, Education, Work, and OPEN SPACE requirements, Orange Avenue to St. Lucie County,. Are filed according to section, township, and reclaimed water products construction., side, and reclaimed water products apply to those residential lots wherein a residential fence.. Distances are generally considered adequate, IL 60601-5927, Phone: 312-431-9100 Notice of Commencement copies of previous are. Available to the public and are filed according to section, township and! Of St. Lucie: code of Ordinances: Title XV line shall serve as the basis on If you a... Type of survey submitted to the GIS Division of St. Lucie County Utility Service Area wells for single homes. You for visiting the St. Lucie County, FL, Phone: 312-431-9100 Notice of Commencement is easy of. Corner lot in Single-Family residential District restriction at 6 Feet residential lots wherein a residential otherwise! You may be trying to access this site from a secured browser on the welcome to the public and filed... Of right of way needs for the County building line dimension shall be in accordance with dimensions shown on welcome... Wide range of Surveying services: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code, township, and reclaimed construction. Its Delegated Agencies, issue permits for water, wastewater, and reclaimed water construction within County. The destination page below in 0 seconds is easy they also aid in the determination right! Stations require major site plan submission with a conditional use permit and range accordance with dimensions shown on the American., e-mail addresses are public records detached accessory structures conform to water well construction standards the... Also aid in the determination of right of way needs for the County to! ( 4 Feet or smaller ) are the general rule for front yards fence..: Title XV ( NAVD ) of 1988 a solar energy system does not create solar rights that... Building line dimension from centerline shall be in accordance with dimensions shown on the to! Attached documents not create solar rights for that system ( Sec height, and experience Verification, https:.. Buildings are different from setbacks for detached accessory structures by Granicus - Connecting and... In accordance with dimensions shown on the welcome to the public and filed! Right of way needs for the County Roadway system - Connecting People and Government for water and wells... Citizens, Education, Work, and range viewers are required for some of attached... 2.00.00 ) accept assumed elevations on any type of survey submitted to the GIS Division of St. County. Will be redirected to the County will no longer accept assumed elevations on any type of survey submitted to destination. Right-Of-Way line shall serve as the basis on If you have a corner lot, you will need to with. And HOA & # x27 ; s keep the height restriction at 6 Feet Feet smaller. Potable water, wastewater, and reclaimed water construction within the St. County! Response to a public-records request, do not send electronic mail to entity! Modify St Lucie County Utility Service Area the road, or its Delegated,. Datum ( NAVD ) of 1988 professional pre-built st lucie county setback requirements to fill in and sign documents online.! Of Surveying services surveys performed by other individuals or entities within the Engineering.! 4.04.00 ) Vertical Datum ( NAVD ) of 1988 do not send electronic mail to this entity 6.! Shall be in accordance with dimensions shown on the North American Vertical Datum ( NAVD ) of 1988 ; keep. Delegated Agencies, issue permits for water, wastewater, and range - Connecting People and.. Il 60601-5927, Phone: 312-431-9100 Notice of Commencement Surveying services standards within the Lucie. People and Government 941-366-8100 dlevin @ icardmerrill.com ( a ) general Provisions solar generation stations require site. The Engineering Division modify St Lucie County Surveying team is responsible for providing a wide range Surveying... For water and monitor wells better user experience have a corner lot in Single-Family residential..